Matt’s Arm Solutions
Complies with ANSI/TIA STANDARD 322 and ANSI/TIA STANDARD A10.48
Common Problems
No rigging headroom for replacing antennas or sector mounts?
Lifting over torque arms and other sector mounts?
No room for tagging the load?
Is the tower accessible to a crane?
Customer unhappy about the crane cost?
Strong Solutions
Our portable, lightweight tools and modular design allow quick assembly. You can easily fit Matts Arm tools in the crew’s work trailer so they can go anywhere your tower is located. They provide rigging headroom with far reach off the tower coupled with high lifting capacity. The design is in accordance with ANSI/TIA Standard 322 and the training per ANSI/TIA Standard A10.48.
Maximum Muscle
All-Inclusive Universal Kit
Matt’s Arm lifting system can be purchased as an all inclusive kit of 6 Configurations
Configuration 1
Monopole Mount with Mast Pipe
Enables the Hoisting Beam to work over the top of Monopoles, and it may rotate +/- 180 degrees.
Configuration 2
Monopole Mount without Mast Pipe
Enables the Hoisting Beam to work between sector mounts on Monopoles and may rotate +/- 90 degrees.
Configuration 4
Beam below the top of a GT/SST
Enables the Hoisting Beam to be face-mounted to either Guyed or Self-Support Towers.
Configuration 5
Beam on a Leg Mount that works over the top of a GT/SST
Enables the Hoisting Beam to be leg-mounted to either Guyed or Self-Support Towers.